Unattended Operation (Overnight)

The notification tile for an event that will watch for a machine error after working  hours.Goal: Be alerted if your machine experiences an error after hours.

Perhaps the error happens early enough in the evening to come in and fix the problem. If it happens in the wee hours of the morning, at least the operator will know that when he walks in the door he needs to go straight to the machine, not the water cooler.

  • Make sure the appropriate individual(s) as setup as contacts. This example assume you’ve setup a contact named, “Operator”.
  • An input has been wired in parallel with the red light on the Swiss machine and has been renamed, “Red light”.
  • Go to the Notifications screen
  • Touch the “New” button, and configure the details as listed below:

the configured details of a notification that will alert the user of an after hours machine error.

Notification details for monitoring overnight. (click to enlarge)

Notification Details

  1. Event Name: Swiss #102
  2. Description: Lights out, overnight
  1. Input: Red light
  2. Trigger: On
  3. Change exists for: 30 seconds
  1. All Day: N
  2. Start Time: 4:00 pm
  3. End Time: (next day)8:00 am
  4. Days: Monday, Tuesday, Wednesday, Thursday, Friday
  5. Start Date: n/a
  6. End Date: n/a
  1. Contacts: Operator
  2. Message Type: SMS (text message)
  3. Message: Swiss machine #102 is down, please come in to fix the problem. Thank you!
  1. Touch Save

Step 16- go enjoy dinner without wondering about your machine.

If you would like assistance configuring an event for your needs, please contact us at (715) 318-1059.


Similar posts
  • Spreadsheet Graphing Templates One of the export options for machine or work order efficiency reports from Nanospark: CNC Machine Monitor is a “.csv file”. A CSV file is useful for importing data into a spreadsheet where it may placed side-by-side with data from other machines for quick comparison, tracked visually over a length of time or other useful [...]
  • Job (or Work Order) Efficiency Report... When we started showing Nanospark to shops this spring, one loud feedback we received was the need to track efficiency by the job or work order. Since the foundation had been laid, it was pretty easy for us to adapt by adding the by job reports feature. Further, the way it’s been crafted, “by job” [...]
  • Preventative Maintenance One of the features of Nanospark: CNC Machine Monitor that we tout is how flexible it is in meeting your unique needs. Here’s an example. Senasys, Nanospark’s parent company, is using the Nanospark: CNC Machine Monitor to add an extra layer of assurance to the preventative maintenance program on their Swiss machine. This is in [...]
  • Running Efficiency Snapshots Goal: Get running efficiency reports from your CNC machine throughout a shift. Use a line graph to get a visual indication of the reason for any dip in efficiency. You may wish to see a report part way through a shift or even hour by hour during a shift. The key to getting this is [...]